Build With Me · Builder

Your starting plan

Your answers

What do you want to build? Something elseWhich platforms? Web (browser)

The link only holds your choices (option ids): no personal data.

Edit my answers

All questions are shown; only the ticked answers count.

The product

What do you want to build?

Required

Which platforms?

Optional · Several answers allowed. “Not sure yet” is a valid answer.

What is the goal?

Optional

Your starting point

Your technical level?

Optional

What do you already have?

Optional

The scope

Which features?

Optional · Tick what is essential — the rest can wait.

How do you want to proceed?

Optional

Your resources

Budget you have in mind

Optional · In Swiss francs. A range is enough.

Time available per week

Optional

Preferred launch

Optional

Existing constraints

Optional

Your plan

A web application

Assumptions (unanswered questions)

  • Level not given: the prerequisites start from the basics.
  • No feature ticked: the v1 is limited to the main flow.
  • No way of working chosen: the recommendation is based on your level, time and budget.
  • Budget not given: no delivery is suggested without scoping.
  • Weekly time not given.

Platform strategy

A web application

A server-rendered application, a relational database and a proven payment provider — the exact stack depends on your constraints, not on a preference.

Why

  • A web application reaches every device without a store, and updates for everyone in one deployment.

Relative complexity

Fairly simple
  • Few features, a single platform.

Relative complexity, derived from your answers — neither a cost nor a duration.

Recommended way to build

Build it together

You stay in control; collaboration happens in writing (instructions, annotated screenshots, captioned recordings), with live sessions only if you want them.

  • Starting from the basics, a guided path is the safest route.
  • This mode is only at the planning-notes stage for this kind of product.

Possible technologies

Possible technologies
ApplicationTypeScript · React · Next.jsServer rendering, server actions and one language from the browser to the database — a solid option, not the only one.Alternative: Another server-rendered framework your team knows.Next.js documentationVercel
DatabasePostgreSQLRelational, transactional, with row-level access rules.Alternative: Supabase for hosted PostgreSQL with built-in authentication.PostgreSQL documentationPostgreSQL

v1 scope

In the v1

The main flow, with no side feature.

Anything that does not help the first real user get the result waits for v2.

What to learn first

The foundations

Files, the terminal, what a server and a database are: an hour of vocabulary saves weeks of confusion.

MDN — Learn web developmentMozilla

Git & GitHub

Version every step so you can go back.

Pro Git (book)Git

HTML, CSS, JavaScript then TypeScript

The base of every web application.

MDN — Learn web developmentMozilla

SQL

Model data and query it.

PostgreSQL documentationPostgreSQL

External dependencies

Hosting and a domain name

A managed hosting platform and a domain in your name.

Testing

Rule tests

Every business rule tested with real cases, without the interface.

The main flow end to end

From sign-up to the main action, on mobile and desktop.

Distribution

Web deployment

Continuous deployment, a preview environment, a domain and indexing.

Next step

Describe your project

Reviewed case by case; a written reply, no call required.

Roadmap

Twelve stages. Each says what “done” means; none promises a duration.

Ticked boxes are kept on this device only.

01Product definitionWrite down who it is for, which problem it solves and how you will know it works.

Deliverables

  • One page: user, problem, expected result
  • Three to five real people to show it to

Prerequisites

  • None

Risks

  • Building for an imaginary user

Checklist

Done when

Someone who does not know you understands the page in one minute.

02MVP scopeKeep the one flow that brings the result to the first user.

Deliverables

  • The “in v1” list and the “later” list
  • The non-goals, written down

Prerequisites

  • Stage 1 done

Risks

  • A scope that grows with every idea

Checklist

Done when

The “later” list is longer than the “v1” list.

03Information architectureModel the data (entities, relations, who owns what) and the screen map.

Deliverables

  • The data model and the screen map

Prerequisites

  • The “in v1” list

Risks

  • Changing the data model once the screens are built

Checklist

Done when

Every v1 screen or step has its place, and every piece of data an owner.

04DesignDesign the main flow on mobile first, then on a large screen.

Deliverables

  • Mock-ups of the main flow, states included

Prerequisites

  • The screen map

Risks

  • Polishing the look before validating the flow

Checklist

Done when

A target user completes the flow on the mock-up without help.

05Development environmentCreate the repository, the project, the environment variables and a first preview deployment.

Deliverables

  • A running “hello world”, versioned in Git

Prerequisites

  • A computer where you can install software

Risks

  • API keys committed to the repository

Checklist

Done when

A code change reaches the screen (or goes live) in under a minute.

06Core implementationBuild the v1 flow end to end, with fake data if needed.

Deliverables

  • A usable main flow
  • Tests for the important rules

Prerequisites

  • Mock-ups and data model

Risks

  • Adding features from the “later” list

Checklist

Done when

A target user gets the promised result, on your device or your test URL.

07Backend integrationConnect real data, accounts, payments and external services.

Deliverables

  • Real data, with backups

Prerequisites

  • The main flow works with fake data

Risks

  • One user’s data visible to another

Checklist

Done when

Two test accounts never see each other’s data, and a test payment goes all the way through.

08TestingProve that the flow works, including when something fails.

Deliverables

  • A replayable checklist before each release

Prerequisites

  • Backend connected

Risks

  • Only testing the happy path

Checklist

Done when

The checklist passes twice in a row without a fix.

09Beta distributionInvite a few real users to a preview version.

Deliverables

  • Five to twenty real users, and their written feedback

Prerequisites

  • Tests passed

Risks

  • Testers who are not your target users

Checklist

Done when

At least three target users completed the flow without you.

10Launch preparationPrepare the domain, the legal pages, search visibility and error monitoring.

Deliverables

  • Legal pages, metadata, error tracking

Prerequisites

  • A successful beta

Risks

  • Launching without knowing when something breaks

Checklist

Done when

Every item on the list is ticked, with evidence.

11ReleaseGo to production and announce it to your first users.

Deliverables

  • Version 1.0 available

Prerequisites

  • Preparation complete

Risks

  • Announcing a date that depends on an external review

Checklist

Done when

A user who does not know you installs or opens the product and gets the result.

12Post-launch improvementMonitor, listen, fix, then pick the next feature from facts.

Deliverables

  • A release rhythm and a prioritised list

Prerequisites

  • Product live

Risks

  • Building the feature one person asked for

Checklist

Done when

Every release fixes or improves something a real user ran into.

Three ways to build

The three ways to build for this kind of product

01 · Learn and buildIn preparation — Planning notes; the guide is not written yet.

Learn and build

At the planning-notes stage: nothing is offered for this mode yet.

02 · Build it togetherOn request — Reviewed case by case, with no price or date promised.

Build it together

You stay in control; an expert reviews, unblocks and steers — in writing first.

03 · Have it builtOn request — Reviewed case by case, with no price or date promised.

Have it built

The product is built for you, after a written scoping.

Planning notes only: the guide is not written. A request is reviewed case by case.